Case studies

Real installers. Real pipelines. Real numbers.

A look at what shifts when the growth infrastructure actually works.

Leeds

Northern Heat Co.

From 18% to 47% quote-to-install in 90 days.

A 12-person MCS installer drowning in enquiries from Google Ads. Quotes sent late, surveys missed, no follow-up. We rebuilt the entire intake-to-install funnel.

+162%
installs booked
47%
quote conversion
11 min
avg response time
Bristol

Greenline Renewables

£340k of recovered pipeline in the first quarter.

Two-year-old quotes sitting cold in an inbox. We built a dormant-lead reactivation sequence that brought 14 jobs back to life in the first three weeks.

£340k
pipeline recovered
14
jobs reactivated
3 weeks
to first install
Brighton

South Coast Heat

Cut admin time per quote from 90 to 22 minutes.

Owner-operator working evenings on quotes. We automated survey scheduling, quote generation and MCS paperwork prep — freeing 14 hours a week.

−75%
admin time
14 hrs
saved per week
2.4×
quotes sent

Want to see what your numbers could look like?

Every pipeline review ends with a clear forecast — not a sales pitch.

See where your pipeline is leaking.

A 30-minute call. No pitch deck. Just a clear look at your enquiry-to-install funnel.